AI Data Centers
Reliable, Scalable, and ESG-Compliant Power for Mexico’s AI Revolution
Mission-Critical Energy Infrastructure
Wyetree delivers turnkey hybrid power systems with solar and natural gas engineered specifically for AI and hyperscale data centers in Mexico. Our zero-CapEx BOOT (Build-Own-Operate-Transfer) model eliminates financial risk while ensuring the high-availability, low-emission energy your AI workloads demand.

The AI Data Center Energy Challenge
AI data centers face unique power requirements that traditional grid infrastructure cannot reliably meet.

Guaranteed Uptime for Mission-Critical AI Workloads
Our hybrid power systems combine renewable energy sources like solar with natural gas generators to ensure reliable and consistent power generation. We deliver 100% reliability through redundant systems, including combined heat and power (CHP) modules and intelligent backup generation. This hybrid approach maximizes renewable energy utilization while maintaining the dispatchable power your most demanding AI applications require.
The AI Data Center Energy Challenge

Unprecedented Power Density
GPU clusters consume 10-50x more power per rack than traditional servers, requiring consistent, high-capacity energy delivery.

ESG Compliance Pressure
Institutional investors and hyperscale operators demand measurable emissions reductions and sustainability certifications.

Zero-Tolerance for Downtime
AI model training and inference operations worth millions of dollars cannot afford grid instability or power interruptions.

Speed to Market
Development timelines are compressed—energy infrastructure delays can cost months of competitive advantage.
Zero Capital Investment, Maximum Flexibility
We finance, permit, and construct your complete energy infrastructure—including hybrid power systems that integrate solar with natural gas, pipeline laterals, metering stations, and backup generation systems. You secure predictable long-term energy costs without any upfront capital commitment, preserving your resources for core AI development.

Proven Mexico Execution
Our team has successfully delivered over 20 infrastructure projects across Mexico, navigating complex permitting, right-of-way acquisition, and regulatory requirements. We understand the local landscape and deliver on schedule.

Thermal Optimization for High-Density Computing
Optional CHP modules capture waste heat for facility climate control, reducing overall energy consumption by up to 30%. This thermal efficiency is critical for facilities running power-hungry GPU clusters and high-performance computing workloads.
Your Competitive Advantage
While competitors struggle with grid limitations and capital constraints, Wyetree-powered facilities launch faster, operate more reliably, and meet institutional ESG standards from day one.
AI Training Centers
Large-scale model development requiring sustained high-power loads and thermal management
Real-Time Inference Operations
Low-latency AI services where power interruptions mean immediate revenue loss

Hyperscale Cloud Zones
Multi-tenant facilities serving enterprise AI workloads with strict SLA requirements
AI Industrial Parks
Integrated developments targeting ESG-conscious tenants and investors
Future-proof your operations with a reliable, cleaner-burning fuel source that enhances competitiveness, enables ESG alignment, and positions your facility as a long-term supplier to the global mobility sector. Wyetree is your partner from engineering to operations.