Last-Mile Infrastructure Solutions
Transform Your Energy Operations with Zero-Risk Natural Gas Access

Last-Mile Natural Gas Solutions
Convert from costly LPG and diesel to clean, reliable U.S. natural gas—without capital investment, permitting delays, or operational headaches.
Wyetree delivers turnkey last-mile natural gas infrastructure directly to your facility through our proven BOOT (Build-Own-Operate-Transfer) model. We handle everything: financing, construction, operations, and maintenance, so you can focus on what matters most—growing your business profitably.
The Last-Mile Challenge Solved
Traditional Approach: Months of permitting, millions in upfront capital, complex regulatory navigation, and ongoing maintenance responsibilities.
Wyetree Solution: Fully financed infrastructure delivered in weeks, not months. Pay only for the gas you consume while we handle all technical and regulatory complexity.

FAST-TRACK DEPLOYMENT
Fast-track deployment with proven execution. Streamlined permitting through established regulatory relationships.

Premium Attraction
Immediate Benefits for Your Operation
While competitors struggle with grid limitations and capital constraints, Wyetree-powered facilities launch faster, operate more reliably, and meet institutional ESG standards from day one.
Dramatic Cost Savings
- 20-40% reduction in annual fuel costs versus LPG or diesel
- Predictable pricing with stable, long-term contracts
- No capital expenditure required—convert CapEx to OpEx
Accelerated Timeline
- Faster deployment through streamlined processes
- Streamlined permitting through established regulatory relationships
- Proven delivery track record with 20+ completed projects

Risk Elimination
- Zero upfront investment or financial exposure
- Guaranteed performance and maintenance included
- Full regulatory compliance and ESG alignment built-in
Operational Excellence
- 24/7 remote monitoring and automated systems
- Dedicated local technical support team
- Seamless integration with existing thermal processes

AI Data Centers
High-uptime gas infrastructure for hyperscale computing. Low-latency delivery, grid independence, optional CHP. GPU-optimized with full permitting & O&M.

Industrial Parks
Attract premium tenants with built-in gas infrastructure. Master planning, laterals & metering included. Boost competitiveness, lower costs. Zero CapEx.

Heavy Industry
Stable gas for thermal-heavy operations. Eliminate trucked fuel dependency. Predictable pricing, environmental compliance, 24/7 support. Zero investment.

Zero-CapEx Natural Gas Infrastructure for Critical Industries
Wyetree delivers turnkey energy infrastructure-as-a-service to Mexico’s most demanding industrial sectors. Our proven BOOT (Build-Own-Operate-Transfer) model eliminates upfront capital investment while providing fully financed, ESG-compliant natural gas interconnection engineered for your industry’s specific operational requirements.
